12-05-09
ACTIVITIES: Today we continued on with the irrigation up in the vegie garden. Irrigation pipe and the solonoid cable had already been placed into the trench a couple of days earlier. One of our jobs was to place sand under the pipe and cable. We also taped the cable to the underside of the pipe. Along the western side trench we set up 3 solonoid outlets. This involved seperating 3 different coloured wires from the main cable and attaching them to the solonoids. Each solonoid had a different coloured wire. Also attatched to each solonoid was a common wire. After this was done the pipe and cable had about 20cm of sand placed on top. The sand was tampered down with a rake. The next step was to back fill the trench with soil. This also had be tampered down with a rake or your boot. So far the job has not been finished.
PPE: Long sleeves, long pants, saftey boots, gloves.
TOOLS: Crow bar, rakes, spades, wheel barrows.
OH&S: Muscular.