8-04-09
Activities: Today we went up to the common area to do some work. This involved extending a brick path, pathing and installing a drainage pit. Russell an myself were to install the new drainage pit. The idea for this was to connect the pit to two existing drainage pipes, so any water over flow would be caught in the pit.
After the hole was dug the pit was placed in and measured up with the pipes. Blue metal was placed at the bottom before the pit went in. Once in more blue metal was placed around the pit.
PPE: Long sleeve clothes, hat, gloves.
Tools: Hacksaw, drill, tape, spade, wheelbarrow.
OH&S: Redback spiders were found in the pit.
Activities: Today we went up to the common area to do some work. This involved extending a brick path, pathing and installing a drainage pit. Russell an myself were to install the new drainage pit. The idea for this was to connect the pit to two existing drainage pipes, so any water over flow would be caught in the pit.
After the hole was dug the pit was placed in and measured up with the pipes. Blue metal was placed at the bottom before the pit went in. Once in more blue metal was placed around the pit.
PPE: Long sleeve clothes, hat, gloves.
Tools: Hacksaw, drill, tape, spade, wheelbarrow.
OH&S: Redback spiders were found in the pit.